{"number":"US12697788B2","kindCode":"B2","documentType":"grant","title":{"original":"Layup process for wind turbine blade manufacturing","english":"Layup process for wind turbine blade manufacturing"},"abstract":{"original":"The present invention relates to a method of manufacturing a wind turbine rotor blade part comprising stacking a plurality of plies (70, 71, 72) to form a stack of plies (80) such that the stack of plies has at least one stepwise tapering edge (84, 85). A plurality of plastic fasteners (90) is used to interconnect the plies (70, 71, 72) by passing the plurality of plastic fasteners (90) through the stack of plies to form a stack of interconnected plies (82).…","english":"The present invention relates to a method of manufacturing a wind turbine rotor blade part comprising stacking a plurality of plies (70, 71, 72) to form a stack of plies (80) such that the stack of plies has at least one stepwise tapering edge (84, 85). A plurality of plastic fasteners (90) is used to interconnect the plies (70, 71, 72) by passing the plurality of plastic fasteners (90) through the stack of plies to form a stack of interconnected plies (82).…"},"applicants":["LM WIND POWER A/S"],"inventors":["Henrik BARSLEV","Ton DOBBE"],"filingDate":"2024-05-08","publicationDate":"2026-08-04","grantDate":"2026-08-04","verifiedWithOffice":true,"pdfUrl":"https://downloadpatent.com/pdf/US12697788B2.pdf","pages":{"en":"https://downloadpatent.com/patent/US12697788B2","zh-Hant":"https://downloadpatent.com/zh-Hant/patent/US12697788B2","ja":"https://downloadpatent.com/ja/patent/US12697788B2"}}