{"number":"WO2009034368A1","kindCode":"A1","documentType":"publication","title":{"original":"Real time priority based scheduling for radar tasks","english":"Real time priority based scheduling for radar tasks"},"abstract":{"original":"The present invention relates to a scheduling scheme for multi function (5) radar. Specifically, the present invention relates to a priority based time scheduler for multifunction radar. The present invention provides a method of scheduling tasks to be performed by a radar comprising the steps of: (i) allocating a priority to each task to be performed; (ii) allocating a readiness level to each said task wherein (10) a predetermined value of the readiness level is determined to indicate that a said task is ready; and (iii) performing the task that has the highest priority and is ready.","english":"The present invention relates to a scheduling scheme for multi function (5) radar. Specifically, the present invention relates to a priority based time scheduler for multifunction radar. The present invention provides a method of scheduling tasks to be performed by a radar comprising the steps of: (i) allocating a priority to each task to be performed; (ii) allocating a readiness level to each said task wherein (10) a predetermined value of the readiness level is determined to indicate that a said task is ready; and (iii) performing the task that has the highest priority and is ready."},"applicants":["BAE Systems PLC"],"inventors":["Charles Christopher Ian Wigmore","William Kenneth Stafford","Paul Birch"],"filingDate":"2008-08-29","publicationDate":null,"grantDate":null,"verifiedWithOffice":false,"pdfUrl":"https://downloadpatent.com/pdf/WO2009034368A1.pdf","pages":{"en":"https://downloadpatent.com/patent/WO2009034368A1","zh-Hant":"https://downloadpatent.com/zh-Hant/patent/WO2009034368A1","ja":"https://downloadpatent.com/ja/patent/WO2009034368A1"}}